Integral Installation at 1112B Wade Ave
Projects·Residential
Residential

Integral Installation at 1112B Wade Ave

Complete Installation Across All Four Levels of a Nashville Residence

Start a Similar Project
Duration
Multi-Day Project
Scope of Work
  • Assembly of interior and exterior furniture, including rooftop pieces.
  • Installation of artwork, mirrors, lighting, and fixtures.
  • Hanging of curtains and placement of rugs throughout.
  • Wallpaper installation in bedrooms and selected areas.
  • Interior painting and TV mounting in multiple rooms.
  • Garage workshop flooring installation and sauna setup.
Accomplishments
  • Full four-level installation executed with precision.
  • Cohesive, functional, and aesthetically polished living spaces.
  • All details met client expectations on time.
Project Overview

About This Project

The team undertook a comprehensive installation at 1112B Wade Ave, Nashville, covering four levels. Services included assembly and placement of indoor and rooftop furniture, TV mounting, mirror and artwork installation, exterior lighting, curtains, rugs, wallpaper, and interior painting. In the garage, industrial rubber flooring was laid and a sauna was assembled — delivering a complete, turnkey residence.

Challenges & Solutions

Challenges

Managing an extensive scope of work across four levels with diverse installation types — from wallpaper and painting to flooring and outdoor furniture — all within a coordinated timeline.

Solutions

Structured level-by-level project management with specialized crews for each task type ensured smooth execution and a cohesive result throughout the entire property.

Project Gallery

Integral Installation at 1112B Wade Ave – photo 1
Integral Installation at 1112B Wade Ave – photo 2
Integral Installation at 1112B Wade Ave – photo 3
Integral Installation at 1112B Wade Ave – photo 4
Integral Installation at 1112B Wade Ave – photo 5
Integral Installation at 1112B Wade Ave – photo 6
Integral Installation at 1112B Wade Ave – photo 7
Integral Installation at 1112B Wade Ave – photo 8
Integral Installation at 1112B Wade Ave – photo 9
Integral Installation at 1112B Wade Ave – photo 10
Integral Installation at 1112B Wade Ave – photo 11
Integral Installation at 1112B Wade Ave – photo 12

Ready for Your Next Project?

Let Vicmar Installation Group handle your project with precision, speed, and professional care.